3Kw Mineral Stainless Steel Mixing Machine PP PE Plastic Dehumidifying Dryer

Place of Origin Qingdao,Shandong,China
Brand Name Kechengda
Minimum Order Quantity 1
Packaging Details wrapping film
Delivery Time 35 work days
Payment Terms T/T
Supply Ability 100

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Operating Type Cycle Operating Motor Power 3(Kw)
Product Usage Stir Solid Particles PP PE Specification 1500*2500mm
Application Area Metallurgy&Mineral Condition New
Applicable Raw Material PE,PP
Highlight

3Kw Stainless Steel Mixing Machine

,

Mineral Stainless Steel Mixing Machine

,

PP PE plastic dehumidifying dryer

Leave a Message
Product Description

Stainless Steel Mixing Machine PP PE Raw Material Drying and Mixing Equipme

 

 

 

 

1. Product Description

Factory direct supply woven bag production machine stainless steel mixing machine PP PE raw material drying blender mixing pot.

 

Applicable raw material PE,PP
Another name mixing machine
Product usage Stir solid particles PP PE
Motor power 3(kw)
Mounting dimension 1500×2500(mm)
Weight 700kg

 

The characteristics of the mixer:

 

  1. This product relies on the function of spiral to make the raw materials in the barrel constantly stirring to achieve the effect of mixing materials and colors, spiral circulation stirring makes the raw materials mix more evenly and quickly.

  2. Another receiving hopper is set at the bottom of the hopper to receive the discarded raw materials directly, and another feeding pipe is sent directly and quickly to the return port to be mixed into the raw materials. It is suitable for the mixing and stirring of various plastic raw materials and color master, and the mixing effect of new and old materials and color master is better (also suitable for the mixing of the materials).

  3. Equipment, raw materials and contact parts of the material are made of stainless steel, easy to clean, avoid corrosion.

  4. Equipped with electronic control safety protection device to ensure safe operation.

 

Use method of mixing machine:

 

  1. Idling the machine before starting the machine to check whether the machine is running normally.

  2. Set stirring time after normal operation.

  3. Pour the material into the port. (Add the material to the middle of the viewing port, not too full)

  4. After stirring evenly, open the feed port and release.

 

Matters needing attention in the work of mixer:

 

  1. Do not open the cover when the machine is running.

  2. The machine shall be maintained after 2-3 months of operation.

 

2.Photos of products and projects

 

3Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 03Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 13Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 23Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 33Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 43Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 53Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 63Kw Mineral Stainless Steel Mixing Machine PP PE  Plastic Dehumidifying Dryer 7

 

3.After-sale service


One year warranty, life-long maintenance;
24 hours online for technical consulting service;
Once Problems on equipment, provide phone or on-site troubleshooting fault response plan.


4.FAQ


Q:Are you a trading company or a manufacturer?
A:We are a manufacturer and we can assure the quality of our machine.

Q:What's your guarantee or the warranty of the quality if we buy your machines?
A:We have one year warranty of the spare parts free of charge. If any quality problems on our side occured in this period ,we will can do some replacement.

Q:How can I install my machine when it arrives?
A:We will send the instruction manual and videos to you,your workers can install the machine accorded as it.If you still have problems in installing it and need our engineer to help,we will arrange our engineer to debugging the machine for you.At same time our engineer will give training lessons to labors in your factory.
Q:How about the spare parts?
A:During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If it is caused by your incorrect operations, we will provide the spare parts at cost price

If you do need any support, please don't hesitate to contact me on.