-
Plastic Profile Extruder Machine
-
WPC Profile Extruder Machine
-
PVC Profile Extruder
-
PVC Panel Production Line
-
PVC Pipe Production Line
-
PVC Sheet Production Line
-
PE Sheet Extruder
-
PP Hollow Board Extrusion Line
-
Plastic Pipe Production Line
-
Plastic Sheet Extrusion Line
-
Plastic Board Extrusion Line
-
Plastic Pelletizing Machine
-
Plastic Auxiliary Equipment
Automatic SHR-Z1000/3000 Cold Hot PVC Mixing Machine Plastic Auxiliary Equipment
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | SHR-Z1000/3000 PVC High-low Cold-hot Mixing Machine | Color | Customizable Colors |
---|---|---|---|
Control | Automatic | Control System | PLC Control |
Voltage | 220V/380V | Weight | 100-1000kg |
Function | Mixing, Drying, Feeding | Warranty | 1 Year |
Highlight | PLC Automatic PVC Mixing Machine,220V PVC Mixing Machine |
SHR-Z1000/3000 PVC high-low cold-hot mixing machine
1. Product Usage:
This unit is suitable for the mixing process in the production of PVC products, such as the production of PVC flooring, PVC pipes, PVC sheets, etc. It can achieve efficient and uniform mixing of PVC materials, ensuring stable product quality and performance.
2. Product advantages
(1) High and low temperature cold and hot mixing to ensure mixing quality.
(2) Accurate temperature control to improve production efficiency.
(3) Energy conservation.
(4) Durable and sturdy structure ensures long-term stable operation.
(5) Safe and reliable design to protect operators.
3. Product parameters
Title | Mxing Capacity | Cooling Temperature | Heating Temperature | Mixing Time | Supply Voltage |
Date |
1000/3000L (Heating/Cooling) |
-10 ℃ to 25 ℃ | 40 ℃ to 160 ℃ | Adjustable | Customized According To Customer Requirements |
4. Product features:
(1) Realize high and low temperature cold and hot mixing.
(2) Precise control of mixing temperature and time.
(3) Adjusting the mixing speed.
(4) Monitoring mixing process parameters.
5. Payment
30% as advance payment by T/T after signing contract;70% as balance after inspection machine before delivery by T/T.
6. Operation Instructions
The seller will provide the actual electric, pneumatic, hydraulic, mechanical parts circuit diagram for each unite of the machine with English language in addition to the original operation manual of the machine that contains the operation instruction, safety instruction, and troubleshooting with parts list for easy order necessary spare parts in the future.Installation issues.
7. Installation Issues
Test run in the buyer’s factory: Seller send engineer for supervision of installation, training and test run. The test run will be finished in about 7-10 days if necessary preparations are made by the buyer such as water, electricity. Materials, work space, labors and so on. The round airplane tickets, visa cost, food, hotel fee and medical insurance of the engineer for installation and test run are paid by the buyer. The buyer pay USD150/per day as subsidy for the engineer.